Installation guide
Learn to install Abrebox A10Pro step by step
1. How to anchor each piece.
1.1. Power supply anchor:
Installation of Abrebox 12VDC power supply on DIN rail.
1st. We anchor the power supply to the DIN rail.
2nd. We mount and unmount the source using the tab.
1.2. Street panel anchor:
1st. We house the box (155x382x32mm) on the wall in surface/recessed mode at a max. 160cm.
2nd. We attach the panel (173x393x34mm) to the box with the two upper metal anchors.
3rd. We attach the panel to the box with the two lower metal anchors and screw.
2. How to connect the cables.
Power supply connection, door opener, Internet and wiring requirements.
3. How to connect to the Internet.
Connect your street panel to the Internet via SIM card, RJ45 to router or by WIFI.
Option 1:
SIM CARD 4G
Insert the MicroSIM card into the slot you will find on the back of the device. Before inserting it, make sure to disable the PIN code of it. After the device is turned on, the street panel will configure its APN automatically.
Option 2:
RJ45
You can connect the street panel through CAT5/CAT6 cable to the router. To do this, there is an RJ45 type input on the connection strip. Just plug and play!
Option 3:
WIFI
If you want to connect the street panel via WIFI:
1º Keep your finger pressed for 3 seconds on the upper left corner of the "configuring" screen.
2nd Select the WIFI network you want to connect to and enter its password.
3º Restart the device.