Installation guide
Learn to install Abrebox step by step
1. How to anchor each piece.
1.1. Power supply anchor:
Installation of Abrebox 12VDC power supply on DIN rail.
1st. We anchor the power supply to the DIN rail.
2nd. We assemble and disassemble the fountain using the tab.
1.2. Street panel anchor:
A) In new construction:
Box skirting, visor placement and street panel anchoring.
1st. We build the embedding box (130x200x60mm) at a height of 160 cm.
2nd. We screw the visor (151x280x50mm) to the embedment box on the wall.
3rd. We anchor the street panel (143x256x44mm) on the visor and screw.
B) In replacement:
Hollow cover frame anchoring to the street panel and fixing to the wall in semi-recessed mode.
1st. We anchor the frame to the street panel through the 4 screws.
2nd. We anchor the frame + street panel assembly to the wall.
3rd. As far as possible, we house the upper part of the panel at 160cm.
2. How to connect the cables.
Power supply connection, door opener, Internet and wiring requirements.
3. How to connect to the Internet.
Connect your street panel to the Internet via SIM card, RJ45 to router or by WIFI.
Option 1:
4G SIM CARD
Insert the MicroSIM card in the housing that you will find on the back of the device. Before inserting it make sure to disable the PIN code of the same. After powering on the device, the street panel will configure your APN automatically.
Option 2:
CAT5 / 6 cable.
You can connect the street panel through CAT5 / CAT6 cable to router. For this, there are RJ45 1/2/3/6 inputs on the terminal strip. Colors: 1: Orange - White.
2: Orange.
3: Green - White.
6: Green.
Option 3:
WIFI
1st At 15 seconds, keep your finger pressed for 3 seconds on the upper left corner of the screen.
2nd Select the WIFI network you want to connect to, enter the password and wait for "connection established" to appear.
3rd Restart the device.